Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Normal
I am a bit peeved that the Charging station in Baker, CA ("worlds tallest thermometer) still isn't on-line. It is now almost a year overdue (it was supposed to open in June '17). It would have been the first non-Tesla 100+ kW charging lot in the U.S. It is an EVgo spot that will charge at "up to 150 kW" and appear to be the ABB DCFCs installed in Fremont, CA (0-350A @ 200-600V). This station will allow easy EV travel between SoCal and Las Vegas. Since L.A. has loads of DCFCs, a trip to Vegas will be possible from San Diego or even Tijuana.